| Main housing and thermal sheild |  
|  |  |  |  | 
|  |  |  
|   | 
|  |  
| Fred, Carl and Rob epoxying the cold stand-off and G-10 ring. |  
|  |  |  |  | 
|  |  |  
|   | 
|  |  
| Optics bench and cold stand-off |  
|  |  |  |  | |
|  |  |  
|   | 
|  |  
| The bench loaded with collumnator, filter wheels and camera |  
|  |  |  |  | 
|  |  |  
|   | 
|  |  
| Copper straps thermally connect the liquid nitrogen tankface to the optics bench  |  
|  |  |  |  | 
|  |  |  
|   | 
|  |  
| Installed thermal straps and temperature sensors  |  
|  |  |  |  | |
|  |  |  
|   | 
|  |  
| Fitting and installing Mylar thermal blankets |  
|  |  |  |  | 
|  |  |  
|   | 
|  |  
| Installing engineering grade detector for testing. |  
|  |  |  |  | 
|  |  |  
|   | 
|  |  
| Loaded bench ready for testing |  
|  |  |  |  | |
|  |  |  
|   | 
|  |  
| Installed bench with components ready for testing  |  
|   |  |  |  |  |  | 
|  |